Article
Publication date: 2 September 2019

Ajibade A. Aibinu, Simon Carter, Valerie Francis and Paulo Vaz-Serra

The purpose of this paper is to study the nature of request for information (RFIs) on construction projects by using data analytics to understand the frequency of RFIs, when they…

Abstract

Purpose

The purpose of this paper is to study the nature of request for information (RFIs) on construction projects by using data analytics to understand the frequency of RFIs, when they occur on projects, and the relationship between project characteristics and frequency of RFIs and between project characteristics and RFI turnaround time.

Design/methodology/approach

A data-analytic approach using RStudio and Minitab software on 168 construction project cases in Australia and New Zealand involving 1,032,949 correspondences and 53,042 RFI event records made available by Aconex, one of the world largest cloud-based project management platform.

Findings

Large and complex projects tend to have significantly larger number of RFI events per day and longer RFI turnaround when compared with smaller and less complex projects. Projects with fewer users per organisation recorded a higher RFI turnaround time when compared with projects with more users per organisation – users mean persons involved in managing the project using the online platform (an index of project complexity). RFIs occur early on less complex projects and occur later on more complex projects.

Research limitations/implications

Benchmarks of RFI incidences and turnaround time have been developed for various project characteristics and, practitioners can use them to monitor the RFI performance of projects. Organisations need to pay greater attention to staffing levels needed to handle RFIs to reduce RFI turnaround time.

Originality/value

A data-analytic study of RFI yielded insights for managing RFIs. The findings of previous studies on RFIs are difficult to generalise because they are based on single project case study. The influence of project characteristics on RFI frequency and RFI turnaround time is not yet known.

Details

Built Environment Project and Asset Management, vol. 10 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 26 September 2020

Paulo Vaz-Serra and Peter Edwards

Knowledge management presents a problem for the architecture, engineering and construction (AEC) industry, largely because of the industry’s fragmented structure and…

Abstract

Purpose

Knowledge management presents a problem for the architecture, engineering and construction (AEC) industry, largely because of the industry’s fragmented structure and project-driven nature. Construction companies may be involved in a variety of projects in different locations, each having its own knowledge requirements. Companies are also expected to be competitive, flexible and innovative, but introducing new knowledge management systems (KMSs) may represent a change that is beyond the organisation’s capacity to undergo successfully, and thus becomes a “nightmare”. The purpose of this paper is to propose and test a KMS solution that can help to facilitate the capture and application of important knowledge without introducing unnecessary changes in internal procedures for the organisation.

Design/methodology/approach

Following a review of existing systems, and an interview survey of 22 managers in the Portuguese AEC industry (contractors, design consultants and project management consultants) a new IT-based construction KMS called ConstruKnowledge was developed. The KMS was tested, verified and validated in two Portuguese construction projects and assessed by 12 managers in the construction company undertaking those projects.

Findings

The results of two pilot tests using ConstruKnowledge in two Portuguese construction projects demonstrate that its use can raise the levels of confidence in decision-making, and retaining knowledge; and that it serves to add value to the company.

Practical implications

The Construknowledge KMS is an innovative contribution to the greater acceptance of KMSs in the construction industry. The system facilitates the effective and efficient development of an organisational KMS using basic Information and Communications Technology (ICT)-based collaboration tools. While undertaken in the context of the Portuguese industry, the KMS has a wider global potential for implementation and further development.

Originality/value

The originality and value of this research are that it demonstrates how a KMS can be developed and then used in a construction company to capture and share knowledge without introducing additional constraints.

Article
Publication date: 13 August 2021

Paulo Vaz-Serra, Peter Edwards and Guillermo Aranda-Mena

Complex projects require careful management. They may expose stakeholders to greater risks and place additional demands upon resources. In the initial stages of project…

Abstract

Purpose

Complex projects require careful management. They may expose stakeholders to greater risks and place additional demands upon resources. In the initial stages of project development, however, little may be known about the nature and magnitude of such complexity. This paper aims to ensure that this gap is at least subjectively assessed and addressed.

Design/methodology/approach

Research, using focus group workshops with a convenience sample of construction professionals, was carried out to test the validity of a Project Early Stage Complexity Assessment Tool (PESCAT). The PESCAT concept brings together selected complexity theories and uses subjectively based measures for assessment.

Findings

The findings confirm that an early-stage project complexity assessment tool is practicable and can contribute to project management practice in the construction industry. It should be applied by individual project stakeholders using small teams of experienced staff. PESCAT explores project complexity through “filter” sets of perspective factors which should be customised to reflect the stakeholder’s role and processes in a project.

Originality/value

In the initial complexity assessment model, resolution space and uncertainty were tested as project complexity parameters. However, in subsequent versions of the tool, four measures (differentiation and differentiation uncertainty; interdependency and interdependency uncertainty) are used in an innovative way that focuses users’ attention more clearly and points to a more targeted approach for addressing project complexity. The value of our model lies in its practical application and the project management benefits it can deliver.

Details

Construction Innovation , vol. 22 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 June 2022

Derek H.T. Walker, Paulo Vaz Serra and Peter E.D. Love

Price reliability for complex and highly complicated infrastructure projects is problematic. Traditional project delivery approaches generally fail in achieving targeted end cost…

Abstract

Purpose

Price reliability for complex and highly complicated infrastructure projects is problematic. Traditional project delivery approaches generally fail in achieving targeted end cost reliability. However, integrated project delivery (and particularly Alliancing), develop a far more reliable and robust project delivery plan and outturn time-cost targets. This paper aims to explore why this may be the case.

Design/methodology/approach

This case study investigated the project design, planning, cost/time estimation approach and how risk/uncertainty was dealt with. Five senior project delivery experts from an organisation that delivers multi-billion-dollar infrastructure projects in Australia were interviewed. These five experts collectively had 100+ cross-disciplinary experience years delivering complex infrastructure projects.

Findings

Alliancing adopts a radically different approach to project design, time/cost planning and risk assessment and management to traditional project delivery approaches. Key findings explain how the project alliance agreement designs-in processes that maximises team integration and collaboration. Analysis concludes that design thinking is used to craft and shape collaborative behaviours and project governance. Additionally, including project owner and facilities operator representatives in the project team adds valuable insights, expertise and knowledge contributing to planning reliability.

Research limitations/implications

This study is exploratory and focussed on complex infrastructure projects so findings cannot be generalised.

Practical implications

We unpack Alliancing processes that develop the target outturn cost plan, comprising a holistic and realistic plan to design a project to meet expected project outcomes. This case study may serve as an exemplar for complex project delivery.

Social implications

This paper illustrates how Alliancing more effectively delivers best value than traditional procurement approaches through its TOC-TAE processes.

Originality/value

The paper contributes to the scant existing academic literature analysing these processes. Its novel contribution is explaining how Alliancing treats unexpected events that in traditional delivery forms trigger expensive and time-energy-wasting disputation. This case study may serve as an exemplar for complex project delivery.

Details

International Journal of Managing Projects in Business, vol. 15 no. 5
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 13 October 2021

Ana Junça Silva and Cannanda Lopes

This study aimed to (1) analyze whether the perceived organizational support (POS) was a significant predictor of performance and stress and (2) explore the mediating role of…

Abstract

Purpose

This study aimed to (1) analyze whether the perceived organizational support (POS) was a significant predictor of performance and stress and (2) explore the mediating role of engagement in these relations.

Design/methodology/approach

To test the hypotheses, the authors collected data with 200 working adults in a mandatory quarantine due to COVID-19 pandemic crisis.

Findings

The results showed that the POS contributed to increase engagement, and consequently, job performance. These relations also proved to be significant for stress, because when the POS increased, the work engagement also increased, and as a result decreased occupational stress.

Research limitations/implications

This study relied on a cross-sectional design. Therefore, future research should consider a daily design to replicate this study and analyze daily fluctuations. Overall, the authors can conclude that work engagement is an affective process through which POS decreases stress and increases performance.

Originality/value

This study tests the mediating effect of work engagement on the link between POS, stress and performance, and its theoretical and practical implications of these findings are discussed.

Details

Journal of Economic and Administrative Sciences, vol. 39 no. 4
Type: Research Article
ISSN: 1026-4116

Keywords

1 – 5 of 5